Aerospace suppliers that want a Tinker-adjacent address need a building ready on a short clock, and a certified industrial park is the shortest path to one. We build light industrial and warehouse space in Midwest City for engine, parts and sustainment companies that must be near the base but cannot afford to wait on a long site-development process. Our work is shells, slabs, utilities and fit-out that match a supplier's equipment rather than a generic box.

Soldier Creek Industrial Park covers 40 acres, is owned by the city's utilities authority, and was developed with a $1 million Economic Development Administration grant and a $2 million city contribution. It is in the city's only opportunity zone. The Oklahoma Department of Commerce recognized it as Site Ready in an article dated December 28, 2016, one of 19 light industrial parks in the state with that certification.

What Site Ready means in practice is that the park has been vetted for utilities, zoning, environmental conditions and title, which cuts the unknowns in a schedule. We still do our own diligence on each parcel, but we begin from a better place than a raw field.

What we coordinate on the schedule

On a park like this we focus our coordination on the work that sets the schedule: site grading, building pad preparation, footings, the slab and the tilt panels or metal frame. Coordinating those trades keeps the critical path in our hands and shortens the time between the notice to proceed and a dried-in building.

We bring in specialty subcontractors for roofing, mechanical, electrical and fire protection, and we coordinate them against the same lookahead. For a jet engine or components supplier, the electrical service, compressed air and floor loading usually deserve the most attention, so we involve your equipment vendors before the slab is poured.

Heavy machinery, engine stands and tooling carts put point loads on a floor that a plain warehouse slab does not see. We detail industrial concrete floors with the thickness, reinforcement and joint spacing that match your equipment list, and we mark the locations of future trenches and pits so a later change does not mean saw-cutting through new concrete.

Engines, parts and the base next door

Global Turbine Systems, a jet engine remanufacturer, committed in May 2022 to buy 24 acres in Soldier Creek, with a planned investment of up to $50 million and up to 270 jobs. A commitment is not a finished building, so we treat the figures as an announcement, but it shows what kind of company is looking at the park.

Tinker Air Force Base forms Midwest City's southern border, and the Greater Oklahoma City Chamber describes a 5,000-acre military industrial complex beside the city. Suppliers that work with the base need hangar-high doors, heavy floor loads, crane rails or secure storage, and they often need more of them each year. We can help you plan for the next building before the first is finished.

The wider air corridor matters too. Parts and sustainment companies commonly move work between the base and the commercial field on the other side of the metro, and we cover that market on our page for the Will Rogers Airport and Tinker area. If your operation straddles both, a building here can serve as a staging and storage node while a hangar-grade building sits closer to the airfield.

Moving fast without cutting corners

Supplier contracts often drive the date, so we work backward from the day equipment must arrive. A typical flow is site prep and utilities, footings and slab, structure, roof and dried-in status, then interior fit-out and equipment set. We hold weekly coordination meetings and publish a three-week lookahead.

The long-lead items on an aerospace support building are often power gear and large overhead doors. We release those orders early and carry the risk of price changes in an allowance if the design is still moving, so the schedule does not hinge on a late selection. We also lay out the site so construction traffic and the later truck flow do not share the same gate when the park is full. Our build-to-suit warehouse process is set up for that cadence.

Who buys in a park like this

Aerospace and defense sustainment is the obvious tenant, but a park next to a major base also draws machine shops, kitting operations, packaging suppliers and parts distributors. A manufacturing and distribution building often combines a production bay with a shipping dock, and we build that hybrid layout with the loads and utilities each half needs, and a tilt-wall warehouse shell is often the most economical way to get there.

Retail and consumer logistics are also present nearby, with the Town Center Plaza shopping area facing both I-40 and the base, and the Reed Center convention space built in 2003. Those uses create demand for service, supply and storage buildings, though they are a smaller part of our work in the park.

Permits, tornado exposure and the Tinker Diagonal

I-40 passes through Midwest City and Del City on the Tinker Diagonal, which provides access to the base. Trucks entering the park use that route, so we plan site entrances and construction deliveries to avoid conflicts with base traffic at shift change.

On May 8, 2003, an F4 tornado crossed Tinker Air Force Base, crossed I-40 into southeast Midwest City and entered Choctaw, damaging houses and downing power lines in Midwest City. Utilities and roof connections are the items we pay attention to on any building here, and we review them with the structural engineer. The state sets minimum codes through the Uniform Building Code Commission, and cities adopt and enforce their own editions and amendments, so we confirm which applies at submittal.

Plan your Midwest City building

Send us your equipment list and your target opening date. We will check the park's utilities against your loads and give you a first schedule and rough budget. For an operator weighing nearby alternatives, we can also look at Del City and the south Oklahoma City sites.

Common Questions

What does Site Ready certification mean for my project?

It means the Oklahoma Department of Commerce recognized the park as having completed due diligence on utilities, zoning and similar items. It does not replace your own diligence or permits, and we still verify the services, easements and soil conditions at the specific parcel. It does reduce surprises and shorten the pre-construction period.

How big a building can fit on a 24-acre parcel?

Parcel coverage depends on setbacks, parking, truck access and detention. As a rule of thumb, a single-story industrial building might cover 30 to 40 percent of a parcel. We test-fit your program against the plat before you commit to a purchase.

Can you build secure space for defense-related work?

We build the structure and shell. Secure facility requirements, such as access control and information security, come from the contracting authority and are specified by your security officer. We coordinate our work with those requirements and can share experience with typical details, without claiming any specific certification.

Is the opportunity zone designation relevant to a building project?

It may have tax implications for an investor, which your tax advisor should evaluate. We make no tax claims. From the construction side, we can help you estimate costs and a schedule so your advisor can model the investment.

Ready to talk about your project?

Send the site, the program and the target date and we will set up a project review.